Eva Turner Rendering to Reality


Tags: Renovation/Addition Elementary Drawings/Rendering


See our designs come to life with our new Rendering to Reality series! Today we’re sharing Eva Turner Elementary School, a 71,064 SF renovation/addition that was completed in 2021. The design rectified the open plan building design by introducing a learning courtyard within the building’s core and flooding the building with natural light and views. The grades are arranged in pods with shared collaborative learning areas offering differentiated learning opportunities.