
Written on Dec 2, 2020
The design-build delivery of the Oakdale Middle School addition with Keller CM is well underway in the construction phase. Exterior work is nearing completion to enclose the building envelope before winter weather arrives. Interior framing is installed and ready for drywall application. This addition is anticipated to be completed in the summer of 2021.
Take a look at the exciting progress below!
Contributors